Index Page
Home
 
 
     
 
 
 
email us
 
     
     
 
CLOSURE OPTIMIZATION
 
 

Taking a design from 99.9% closed to 100% closed is the last stage in any project, and is typically manual or pseudo-manual . Using a subset of the rule-based techniques developed in our Predictive Analysis product, TimeVision can fix-to-closure setup, transition and hold timing problems.

 
     
 
Read existing physical and timer data – no new STA engine that requires correlation
Automatic setup and transition fix ECO
 
MCMM capable
Use multi-scenario capabilities to ensure implementation & signoff tools see design closed
Go beyond trivial sizing operations on complex violators
Automatic MCMM hold fix
 
Setup aware
ECO or Verilog/DEF export
 
     
     
   
 
COMPANY   |   PRODUCT   |   SERVICES   |  BLOG
 
NEWS   |   CONTACT
   
 
Back to Home  |  Privacy Policy
 
Copyright © 2009 Ausdia Inc